Final location reached – cutting can begin…..

Building a Mobile Workshop from a 20-Foot Shipping Container: A Sustainable Solution

Converting a 20-foot shipping container into a mobile workshop offers numerous advantages, particularly in terms of flexibility, mobility, and sustainability. This robust, portable solution is ideal for those who work in various locations and need to rely on familiar and, in some cases, required work environments. In this case, the construction of a new container was necessary to replace an older one that had been in use for more than 20 years. Another interesting detail: the tools used in the old mobile workshop proved to be so durable, thanks to their high quality and the staff’s careful handling, that they could easily be transferred to the new container.

The Starting Point: An Aging Container

After more than 20 years of use, the old container was in a worn-out condition. Weather, frequent transport, and daily use had left their marks. As a result, General Electric, one of our most important customers, decided to acquire a completely new container.
Ankunft des neuen Bearbeitungszentrums für Zerspanen

Planning and Preparation for the Conversion

Before the conversion could begin, extensive planning was required. First, the old tools and existing interior setup were inspected. The tools, which had served faithfully for over two decades but were partially replaced over the years, were checked and transferred to the new container. These were high-quality devices that showed minimal wear—a clear advantage that highlights the investment in quality. Furthermore, the specific requirements for the new workshop were determined. The door-behind-door system offers the benefit of sealing the workshop inside the container almost hermetically from the outside environment. This also contributes to efficiency, as both the cooling needed in summer and the heating in winter remain where they are needed—inside the container. The double door at the front makes access to the container’s interior much easier, something anyone who has worked with shipping containers can appreciate.

Ankunft des neuen Bearbeitungszentrums für Zerspanen

The Construction Process

The actual construction started with a standard shipping container. Then, the usual modifications followed: insulation installation, floor/wall/ceiling assembly, electrical work, and the integration of operational equipment. New shelves, drawer systems, and tool holders once again ensured organized and clearly arranged storage for the tools. As part of environmentally conscious decisions, new machines and equipment were also installed, reflecting the latest technology and contributing to environmental protection through their energy efficiency.

Ankunft des neuen Bearbeitungszentrums für Zerspanen

A Sustainable Approach

By reusing the existing tools, a sustainable solution was achieved. Instead of consuming new resources, the available stock was cleverly utilized and modernized. This demonstrates that quality and durability, combined with thoughtful recycling, can offer significant long-term benefits—both for the budget and the environment.

Ankunft des neuen Bearbeitungszentrums für Zerspanen

Conclusion

Converting a 20-foot shipping container into a mobile workshop demonstrates the versatility of these transport containers. The reuse of old tools—and in other projects, even the entire container—proves that sustainability and cost-effectiveness can go hand in hand. With a flexible door-behind-door system, modern equipment, and durable materials, the new workshop now provides a contemporary solution for all future requirements, likely for the next 20 years.

Contact form

Please submit your request to AWB

Privacy policy

3 + 2 =

We will be happy to advise you.

Also on site at your company.

AWB berät Sie gerne. Auch vor Ort in Ihrem Unternehmen.